By integrating these components to the operational framework, businesses can superior safeguard their drilling actions against fluid loss and its linked impacts. Peak of fracture: width of fracture entrance = 6: 1, the coincidence degree in the indoor and subject drilling fluid lost control effectiveness is higher, and also the analysis resu